Aluminum Formwork Project Operation Process

1. Project Evaluation and Quotation: Based on the architectural and structural drawings provided by the client, a technical evaluation will be conducted, and a reasonable quotation will be provided to the client. 2. Aluminum Formwork Design: Within seven days of signing the aluminum formwork project contract, the building structure will be deepened, and the aluminum formwork design scheme will be completed and submitted to the client.


2025/03/06

Advantages of aluminum formwork

High Construction Efficiency: Aluminum formwork is easy to assemble, lightweight, and highly efficient for manual assembly. Skilled workers can assemble 20-30 square meters per person per day. Under normal standard layer assembly conditions, one layer can be turned over in 5-6 days, significantly improving construction progress.


2025/03/06

The main function of scaffolding

Work platform provided: Scaffolding provides a stable work platform for construction workers, enabling them to work at heights, such as bricklaying, painting, and installing doors and windows.


2025/03/24

The application of aluminum formwork in construction engineering

Residential buildings: Construction of standardized components such as shear walls, floor slabs, and beams and columns. Commercial complexes: Precise pouring of complex structures (such as curved walls and inclined columns).


2025/03/24

Key points for the safe use of climbing frames

Regular Inspection: Inspect key components such as attachment points, fall arrestors, and bolted connections before each lift and lowering operation. Load Control: Strictly prohibit overloading; materials should be stacked evenly.


2025/03/24

Core structure of the climbing frame

Scaffolding System: Constructed from uprights, crossbars, and bracing to form a work platform. Attachment Support: Provides stable support through anchorages connected to the building structure.


2025/03/06

Maintenance and upkeep of aluminum formwork

Cleaning and Maintenance: Regularly clean dust, soil, and other debris from the surface of the aluminum formwork. Avoid using corrosive cleaning agents.


2025/03/06

Construction process of aluminum formwork

Cleaning Aluminum Forms: Before use, clean the surface of the aluminum forms to remove dust, stains, and other impurities.


2025/03/06

Precautions for Scaffolding Use

Safety Check: Before using the scaffolding, a thorough safety check must be carried out to ensure that all components are intact and the connections are secure.


2025/03/06

Types of scaffolding

Coupler-type scaffolding: This is the most common type of scaffolding, composed of steel pipes and couplers. It offers advantages such as easy assembly, high load-bearing capacity, and wide applicability.


< 1 >

Contact Us

E-mail:

service@cnaluminumformwork.com

sale@cnaluminumformwork.com

Mobile phone number:

Mr. Geng: +8613513021888

Mr. Yang:+8615226795555

Mr. Geng: +8616630863211

Company Address:

No. 19, Ping'an Road, Zhenluanbao Town, Renqiu City, Cangzhou City, Hebei Province