Aluminum Formwork Project Operation Process

1. Project Evaluation and Quotation: Based on the architectural and structural drawings provided by the client, a technical evaluation will be conducted, and a reasonable quotation will be provided to the client. 2. Aluminum Formwork Design: Within seven days of signing the aluminum formwork project contract, the building structure will be deepened, and the aluminum formwork design scheme will be completed and submitted to the client.

03-19 17:55

Aluminum Formwork Project Operation Process

1. Project Evaluation and Quotation: Based on the architectural and structural drawings provided by the client, a technical evaluation will be conducted, and a reasonable quotation will be provided to the client.

2. Aluminum Formwork Design: Within seven days of signing the aluminum formwork project contract, the structural detailing and aluminum formwork design will be completed and submitted to the client.

3. Aluminum Formwork Production: The factory will produce and process the formwork according to the client-approved formwork scheme, completing production and packaging by area within 30 days.

4. Aluminum Formwork Delivery to the Construction Site: The aluminum formwork will be loaded and transported to the construction site.

 

 