Production and sales lease: aluminum template, disc scaffold, climbing frame
Products
Contact us
E-mail:
service@cnaluminumformwork.com
Mobile phone number:
Mr. Yang:+8615226795555
Mr. Geng: +8616630863211
Company Address:
No. 19, Ping'an Road, Zhenluanbao Town, Renqiu City, Cangzhou City, Hebei Province


Aluminum formwork
- Description
-
Aluminum formwork is a new type of building formwork system, made of aluminum alloy profiles through mechanical processing and welding processes.
High construction efficiency: Aluminum formwork is easy to assemble, lightweight, and highly efficient for manual assembly. Skilled workers can assemble 20-30 square meters per person per day. Under normal standard floor assembly conditions, one floor can be turned over in 5-6 days, significantly improving construction progress.
Stable quality: After the aluminum formwork is demolded, it can reach the standards of surface finish and fair-faced concrete, eliminating the need for other processes, resulting in high construction quality.
Reusable: Aluminum formwork components are made of aluminum alloy profiles formed by integral extrusion. Under standardized use, the formwork can be reversed more than 300 times, reducing construction costs.
Environmentally friendly and energy-saving: Aluminum formwork components can be reused, and after construction and demolding, the on-site environment is safe, clean and tidy. After the aluminum formwork is scrapped, it is all recyclable material, conforming to the concept of green buildings.
Wide range of applications: Aluminum formwork can be used in various building structures such as super high-rise buildings, basements, residential buildings, and corridors, with a load-bearing capacity of 50-60 kN/m².Nine major characteristics of aluminum alloy formwork
Lightweight and high strength:Building aluminum formwork is approximately 30kg/㎡, which is the lightest among existing metal building formworks. The construction process can be completely manually assembled and transported without relying on lifting machinery. (Workers usually only need a wrench and a small hammer, which is convenient and quick). Experimental test data show that the bending strength of aluminum alloy is three times that of ordinary steel, with tensile strength >180mpa and yield strength >180mpa.
One-time molding design, strict construction, high precision:The construction drawings are designed in one go, with overall casting and strict construction. The wall formwork, top formwork, and support systems are organically integrated. The formwork is fully assembled at one time to achieve one-time construction; with small errors and high precision, ensuring the overall strength and service life of the building, making it very suitable for high-rise standard floors, super high-rise buildings, and multiple buildings with the same unit type.
Easy to assemble and disassemble, saving labor:Aluminum formwork construction is simple and does not rely on formwork technicians with long-term experience. It is easy to learn assembly and disassembly. Skilled installers can install 20-30 square meters per person per day. Ordinary workers can operate independently after simple training (compared to wood formwork: aluminum formwork installers only need 70-80% of wood formwork installers, and do not need skilled workers, only simple training for construction personnel before installation is required, thus saving labor).
High number of repeated uses, cost allocation:All components of the low-aluminum formwork system can be reused, and under standard construction, the service life is long; there are records of more than 300 uses of aluminum formwork in the United States, and the unit cost is low after allocation.
Wide range of applications, strong load-bearing capacity:The aluminum formwork system is suitable for all building components, such as load-bearing walls, columns, beams, floor slabs, stairs, balconies, etc., which can be completed by cement casting at one time. All parts of the aluminum alloy building formwork system are assembled from aluminum alloy plates. After the system is assembled, a complete framework is formed, with excellent stability, and strong uniformly distributed load and concrete pressure bearing capacity, effectively ensuring the building quality.
Good construction effect and quality, no plastering required:Good construction effect, accurate geometric dimensions, verticality and flatness tolerances are controlled within 3-5mm, smooth and flat, which can reach or approach the effect of fair-faced walls, and the joints are fine, the walls are beautiful, and the later decoration is convenient, which can reduce or eliminate secondary plastering operations, thus reducing or eliminating plastering costs.
High construction efficiency, short construction period:Aluminum formwork is a quick-release system. Depending on the climatic conditions, it generally takes 18-36 hours to demold. Therefore, only one layer of aluminum formwork and three layers of single supports are needed, which can maximize the speed of engineering assembly and construction disassembly. Normal construction can reach 4-5 days per floor, thus greatly shortening the construction period, saving management costs for the construction unit, and shortening the development cycle for real estate developers.
No construction waste, safer construction; high recovery rate:Aluminum formwork does not rust and has no fire hazard. There are no nails on the construction site, nor are there any leftover wood chips and sawdust from electric saws and other construction debris, making the construction site safe and clean. Aluminum formwork has high recycling value, and aluminum alloy materials can be continuously recycled, fully complying with national low-carbon, environmentally friendly, green building, and sustainable development industrial policies.
Unique support system, convenient for material transportation and walking on the construction site:The bottom support system of the aluminum formwork adopts a "single-pipe vertical and independent" support, with an average spacing of 1.2 meters. For general floor heights, no horizontal or diagonal pulling support is needed, and construction personnel can move materials and walk freely on the construction site. The single support is easy to remove.
Key words:
INQUIRY IMMEDIATELY
If you have found the product you want or want to design your exclusive product, please feel free to contact, we are here to provide you with 27*24 hours service
recommend products